Reddog
  • Home
  • Practice
    • About
    • People
      • Paul Worroll
      • Graham Tippins
      • Russell Peters
      • Emma Healy
      • Nick Harvey
      • Simon Depczynski
      • Nick O'Sullivan
      • Ross Summergreene
      • Debra Macqueen
  • Projects
    • Residential
      • DK House, Wilston
      • SM Residence
      • Spry House Extension
      • NA House, Fairfield
      • Jenkins House, Wavell Heights
      • CC House Extension, Hendra
      • GT House Extension
      • Simpson House Extension
      • H1 House
      • Elysium House Lot 3
      • Summerville Residence
      • Moritz Residence
      • KG Residence
    • Multi-Residential
      • North High Street Townhouses
      • Latitude, Mackay
      • The Leichhardt
      • Rivage Apartments
      • Darling Place, Ipswich
      • 70 Hope Street, South Brisbane
      • Bulimba Apartments
    • Retail
      • Mt Sheridan Plaza, Cairns
      • Park Beach Plaza, Coffs Harbour
      • JB HiFi, Cleveland
      • Stockland, Rockhampton
      • Orana Mall, Dubbo
      • Ashgrove Retail Centre
    • Interiors
      • 385 St Pauls Terrace, Fortitude Valley
      • MWH Fitout
      • Lambert & Rehbein Fitout
      • CBD Homes Fitout
    • Industrial
      • Bayvista
      • Murrumba Downs AWTP
      • Wynnum WTP
      • Southbound Exchange, Townsville
    • Public
      • MBRC Sports Park, Burpengary
      • Nundah State School Swimming Pool
      • King George Square, Brisbane
  • News
  • Contact
Details Close

Murrumba Downs AWTP

Located in one of the highest population growth areas in South East Queensland,Pine Rivers Shire Council has committed itself to the upgrade of the existing Murrumba Downs Wastewater Treatment Plant. The aim of the upgrade is to provide a large volume of recycled water for industrial use, reduce odour emissions from the plant and improve treatment standards.

We have been directly involved in the design of the Advanced Water Treatment Plant (AWTP) which will produce up to 4 million litres of recycled water daily for nearby industry use.

The challenge of the design was the integration of the multi-faceted new building within the existing plant. Located centrally in an excavated side of the sloping site with access from both the upper and lower roadways, the building (currently under construction) will dually service the site from an upper and lower level.

Consisting of four individual buildings with separate functions, the design brief called for a larger amalgamated building to be integrated into the secluded site. We have used translucent and solid industrial materials that wrap over and around one-another to make reference to the existing wrapped building forms whilst producing a cohesive new age building showcasing the latest in recycled water technology.